PROJECTS

Confidential

Advice on standard versus advanced technologies to optimise field design and economic performance for an onshore oilfield.  Integrated subsurface and well technology analysis to collaboratively derive optimum value for a circa 1 billion barrel field.

Treemax

Talisman Energy - Marginal Field Development Support

String of Pearls project analysing the potential to produce and tieback a series of proximal discoveries using subsea linkage of the fields. Risk based economics were produced for each marginal field and then linked to analyse the combined effects of the portfolio.

Riskmax / Treemax / Fieldmax / Drillmax

BP GWO

BP worldwide provision of competency management systems incorporating skills and knowledge tracking, career development, critical skills, simulation, testing, certification and eLearning.

Casmax

Ranger Angola - Multi-Lateral Well Design Planning & Procurement

Designed first MLT well from a semisubmersible rig in deepwater for the Kiame field. FPSO was on order and only one well was expected to be ready for production. To enhance production in the time frame and to meet schedule requirements an MLT well was planned which led to a dramatic improvement in field economics and was an economic success.

Riskmax / Treemax / Fieldmax / Drillmax

Talisman Energy - Marginal Field Development Support

Tartan infill drilling risked economic evaluation looking in to TTRD and CTD potential for small accumulations being brought on-stream without risking existing reserves recovery and production of current wells.

Riskmax / Treemax / Fieldmax / Drillmax

BP - Atlantic Margin - Subsea Protection Strategy

Risk Analysis of drilling Deep Water wells west of Shetland in water depths to c. 1500m. Looked in to risks of fishing vessels, weather, submarine collision, temperature profiles.

Riskmax / Treemax / Drillmax

Nexen - Rig Contract Strategy

Risk Management advice on rig contracting strategies for an Exploration portfolio.

Riskmax / Treemax

Shell International

Deployment of competency assurance system globally (subsequently integrated to SAP HR).

Casmax

Bg

Deployment of competency assurance system globally.

Casmax

Lasmo

Deployment of competency assurance system for the Markham Field.

Casmax

Confidential

Marginal field evaluation and recommendations for improved economic performance for a small marginal HPHT field using advanced technology for well design and production facilities. Demonstrated potential for economic recovery using simplified well design and an independent buoy production facility.

Drillmax

Total - Dalian Angola

2005 Risk Management of the deployment of Xmas trees across live production lines alongside active drilling units in deepwater.

Riskmax

Talisman Energy - Riser Replacement

2010 Risk Management of central processing platform shut down decision when replacing a riser with a heavy lift barge alongside.

Riskmax / Treemax

Talisman Energy - Marginal Field Development Support

Design optimisation of the Burghley field marginal field comparing complex designer wells with standard technology to produce from three proximal horizons. A cost saving of £20m was outlined with a 20% enhanced probability of success.

Riskmax / Treemax / Fieldmax / Drillmax

Talisman Energy - North Sea

2006 - Auk field acquisition and conceptual field design for Auk North evaluating ERD vs subsea tieback vs Unmanned Platform. Performed detailed Risk Management for submission to Board for financial sanction.

Riskmax / Treemax / Fieldmax

Halliburton

Deployment of competency assurance system in support of integrated services.

Casmax

Talisman Energy - Marginal Field Development Support

Claymore rig upgrade evaluation using risk analysis and option decision making techniques to compare the economics of a major or minor rig upgrade to tieback prospects in the area.

Riskmax / Treemax / Fieldmax / Drillmax

Talisman Inc

Deployment of competency assurance system globally (integrated to SAP HR).

Casmax

Talisman Energy - Marginal Field Development Support

Modular rig study analysing the pros and cons of using a modular rig for drilling and completions on the Montrose and Arbroath fields.

Riskmax / Treemax / Fieldmax / Drillmax

Nexen CNOOC

Evaluation of the economic impact of using a modular rig for infill drilling and workovers on the Buzzard field (North Sea). Included complex simulations of probabilistic interventions, costs and production impacts.

Riskmax / Treemax / Fieldmax / Drillmax

Maersk Oil & Gas

Deployment of competency assurance system in North Sea.

Casmax

Confidential - Shut Down Risk Assessment & Decision Making

Risk assessment and decision analysis for a major shut-down decision for a central processing platform when conducting upgrades to risers using a DP heavy lift barge alongside.

Riskmax / Treemax

BP - Atlantic Margin - Conceptual Field Design

Conceptual field designs for the Claire, Foinavon and Schiehallion deepwater fields.

Riskmax / Treemax / Drillmax

BP Harding - Risk Assessment Of Feasibility Study

Review of the associated risks of the subsurface, (reservoir, geology, completion), drilling and facilities upgrade cost implication for an extended reach satellite development. Derived the optimal risked NPV option revealing multi-million pound potential improvement in the project.

Riskmax / Treemax / Fieldmax / Drillmax

Talisman Energy - Rig Destruction

2009 Risk Management of a planned rig removal from a platform using gin pole techniques and abseil specialists in an exceptionally dangerous situation.

Riskmax

ExxonMobil

Deployment of competency assurance system in mid North Sea.

Casmax

Talisman UK

Deployment of competency assurance system in mid North Sea.

Casmax

Confidential

Evaluation of the probability of companies being found grossly negligent in a major accident for a large international investor.

Riskmax / Treemax

Premier Oil

Deployment of competency assurance system globally.

Casmax

Talisman Energy - Marginal Field Development Support

Scapa field production riser replacement risk assessment analysing the safety risks associated with complex construction in a restricted area.

Riskmax / Treemax / Fieldmax / Drillmax

Talisman Energy - Creation of a Risk Management system

Initiated in 2005 and continued through audit to implementation across Wells, Subsurface and Facilities. Projects facilitated have covered accident prevention, performance optimisation, environmental protection and feasibility evaluations.

Riskmax

Amerada Hess

Deployment of competency assurance system in mid North Sea.

Casmax

Total UK - HPHT Workover Options Analysis

Franklin field development workover risk evaluation of options for complex re-entry and workover following two failed attempts. Included partner liaison and detailed risk assessment plus economic evaluation of each alternative approach and optimised recommendations.

Riskmax / Treemax

Talisman Energy - Marginal Field Development Support 

Claymore ERD vs Subsea tieback risked economic analysis and recommendations for a satellite field production opportunity.

Riskmax / Treemax / Fieldmax / Drillmax

Global Marine

Deployment of competency assurance system in support of drilling project management.

Casmax

Confidential - Acquisition Advice

Risk Management of numerous evaluations of oil and gas fields for possible purchase by an Operator from 1997 to 2008. Included accident prevention and environmental risk management.

Riskmax

Kerr McGee

Deployment of competency assurance system in mid North Sea.

Casmax

Total UK

Deployment of competency assurance system in mid North Sea.

Casmax

Confidential

2009 - Risk Management including a Treemax simulation of potential outturns of a major environmental incident in which a 30% fall in market capitalisation and oil on every shore in a major continental shelf was envisaged.

Riskmax / Treemax

Talisman Energy - Acquisition Support

Acquisition advice on purchase of 40 producing fields and most rapid expansion of an Operator in the North Sea. Conceptual design of tiebacks, new fields, risk management of purchased fields, Well Engineering input to field economics for acquisitions. Fields included Claymore, Piper, Tartan, Montrose, Arbroath, Scapa, Beatrice, Buchan, Clyde, Ross, Auk plus a number of declined prospects. Estimated 85 field evaluations in total.

Riskmax

ConocoPhillips Jasmine Field - Risk Management and Economic Evaluation

2008 - Risk Management of various design alternatives for the development of the Jasmine HPHT field including use of Treemax and Fieldmax simulations of different conceptual field designs and economic results. Simulated various numbers of platforms and drill centres to recommend optimal configuration.

Riskmax / Treemax / Fieldmax

Multiple Clients - Risk Management

Over 250 project Risk Assessments performed internationally for Well Engineering, Facilities and Subsurface team clients covering conceptual field design, well planning, facilities upgrade and ranging from detailed pre-operations to initial concept screening.

Riskmax

Talisman Energy - Marginal Field Development Support

Auk North conceptual design comparing subsea tieback with minimal facilities platform and ERD. Options analysed included export to Auk Main and Fulmar. Recommended subsea tieback which was implemented with considerable success.

Riskmax / Treemax / Fieldmax / Drillmax

Confidential 

Conceptual field design and re-analysis of economics for a non-operated field considering phased development, MOPU facilities, well design simplification and cash flow optimisation. Resulted in substantial improvement in overall economics recommended to the Operator and partners.

Riskmax / Drillmax

Confidential - Risk Assessment for Relief Well Drilling

Risk and decision analysis for potential relief well to deal with a leaking wellhead for a producing subsea well.

Riskmax / Treemax / Drillmax

Dong Denmark - Feasibility Study & Risk Assessment

Risk analysis for the Nini field ERD project to ascertain the chances of successful completion in a complex designer well inter-bridging two production horizons separated by shale which had failed to reach TD on previous occasions.

Riskmax