Talisman Energy - Marginal Field Development Support

Riskmax / Treemax / Fieldmax / Drillmax

String of Pearls project analysing the potential to produce and tieback a series of proximal discoveries using subsea linkage of the fields. Risk based economics were produced for each marginal field and then linked to analyse the combined effects of the portfolio.

Ranger Angola - Multi-Lateral Well Design Planning & Procurement

Riskmax / Treemax / Fieldmax / Drillmax

Designed first MLT well from a semisubmersible rig in deepwater for the Kiame field. FPSO was on order and only one well was expected to be ready for production. To enhance production in the time frame and to meet schedule requirements an MLT well was planned which led to a dramatic improvement in field economics and was an economic success.

Talisman Energy - Marginal Field Development Support

Riskmax / Treemax / Fieldmax / Drillmax

Tartan infill drilling risked economic evaluation looking in to TTRD and CTD potential for small accumulations being brought on-stream without risking existing reserves recovery and production of current wells.

BP - Atlantic Margin - Subsea Protection Strategy

Riskmax / Treemax / Drillmax

Risk Analysis of drilling Deep Water wells west of Shetland in water depths to c. 1500m. Looked in to risks of fishing vessels, weather, submarine collision, temperature profiles.

Nexen - Rig Contract Strategy

Riskmax / Treemax

Risk Management advice on rig contracting strategies for an Exploration portfolio.

Shell International

Casmax

Deployment of competency assurance system globally (subsequently integrated to SAP HR).

Bg

Casmax

Deployment of competency assurance system globally.

Lasmo

Casmax

Deployment of competency assurance system for the Markham Field.

Confidential

Drillmax

Marginal field evaluation and recommendations for improved economic performance for a small marginal HPHT field using advanced technology for well design and production facilities. Demonstrated potential for economic recovery using simplified well design and an independent buoy production facility.

Total - Dalian Angola

Riskmax

2005 Risk Management of the deployment of Xmas trees across live production lines alongside active drilling units in deepwater.

Talisman Energy - Riser Replacement

Riskmax / Treemax

2010 Risk Management of central processing platform shut down decision when replacing a riser with a heavy lift barge alongside.

Talisman Energy - Marginal Field Development Support

Riskmax / Treemax / Fieldmax / Drillmax

Design optimisation of the Burghley field marginal field comparing complex designer wells with standard technology to produce from three proximal horizons. A cost saving of £20m was outlined with a 20% enhanced probability of success.

Talisman Energy - North Sea

Riskmax / Treemax / Fieldmax

2006 - Auk field acquisition and conceptual field design for Auk North evaluating ERD vs subsea tieback vs Unmanned Platform. Performed detailed Risk Management for submission to Board for financial sanction.

Halliburton

Casmax

Deployment of competency assurance system in support of integrated services.

Talisman Energy - Marginal Field Development Support

Riskmax / Treemax / Fieldmax / Drillmax

Claymore rig upgrade evaluation using risk analysis and option decision making techniques to compare the economics of a major or minor rig upgrade to tieback prospects in the area.

Talisman Inc

Casmax

Deployment of competency assurance system globally (integrated to SAP HR).

Talisman Energy - Marginal Field Development Support

Riskmax / Treemax / Fieldmax / Drillmax

Modular rig study analysing the pros and cons of using a modular rig for drilling and completions on the Montrose and Arbroath fields.

Nexen CNOOC

Riskmax / Treemax / Fieldmax / Drillmax

Evaluation of the economic impact of using a modular rig for infill drilling and workovers on the Buzzard field (North Sea). Included complex simulations of probabilistic interventions, costs and production impacts.

Maersk Oil & Gas

Casmax

Deployment of competency assurance system in North Sea.

Confidential - Shut Down Risk Assessment & Decision Making

Riskmax / Treemax

Risk assessment and decision analysis for a major shut-down decision for a central processing platform when conducting upgrades to risers using a DP heavy lift barge alongside.